Hotels have six months to change and one month to open. We work to that clock: crews that stay on the island, GRC production that starts in November, handover wing by wing.
Why hotels call us
One crew for five trades
Walls, ceilings, lighting, GRC room furniture and exterior screens from the same team. Fewer subcontractors, fewer gaps in responsibility.
Materials for salt and sun
GRC does not rust, swell or fade. It is the right material for a façade in the Cyclades or Cyprus.
The room as a product
Curved desks, shelves, headboards and bathroom counters repeated in 40 or 100 rooms with the same precision, from the same mould.
An off-season schedule
Take-off in summer, production in autumn, installation in winter, handover before April. We have done it many times.
Coordination with architects
3D models for approval, material samples, ceiling plans with the electrician and the HVAC contractor. Fewer surprises on site.
Written quote, measurement
Itemised quote per room type or area, fixed price, measurement with the site engineer at handover.
Hotels the family has signed
Projects of Elliniki Gypsotechnia – Fountas Bros, on which the same team worked:
- Royal Myconian Resort & Thalasso Spa, Mykonos
- Imperial, Avaton & Ambassador Myconian, Mykonos
- Myconos Riviera Hotel & Spa
- Hotel Grande Bretagne, Athens
- King George, Athens
- Anassa Hotel, Cyprus
- Aldemar Olympian Village
- Louis Hotels (Corfu, Rhodes, Zakynthos)
- Pelagos Suites, Kos
An off-season renovation
- 01
June – September
Take-off from drawings, 3D for the bespoke elements, samples, quote per room type.
- 02
October – November
GRC production in Athens, shipment planning, crew arrival.
- 03
December – March
Construction wing by wing, coordination with services and painters, internal inspections.
- 04
April
Measurement, snag list, handover before opening.
-
Suite: GRC desk with cove lighting -
Spa: sculpted panels and pool -
Outdoor screen -
Suite: bathtub behind a perforated screen
Frequently asked
Can you work on an island without a base there?
Yes. The crew stays on the island for the duration of the phase. Materials and GRC elements arrive by scheduled shipments from Athens.
The hotel is open. Can you work with guests in house?
In limited zones and hours, yes. Drywall is relatively quiet and clean, but we plan it together.
Do you give a warranty?
A written workmanship warranty plus the manufacturers’ certified systems. Terms are set in the quote per project.
Request a quote
Send drawings, photos or simply the square metres. We reply the same day, and the itemised quote usually follows within 3 working days.